d/lloodd11_125

Aktueller Eintrag abgelaufen

Name d/lloodd11_125
Aktualisiert 26. Okt. 2024, 17:05 UTC vor 1.8y · Höhe 742,973
Läuft ab 30. Juni 2025, 07:51 UTC ca. vor 1.2y · -60,644 Blöcke
Erstmals registriert 2. Dez. 2013, 14:11 UTC vor 12.7y · Höhe 148,957
Letzte Update-Tx cf51d7a04686…9bdf5a9ca3

Wert

 

Operationsverlauf (6)

TRANSFER Oct 26, 2024 · 05:05 PM UTC blk 742,973
TRANSFER Feb 26, 2024 · 12:20 AM UTC blk 707,693
TRANSFER Jul 6, 2023 · 06:15 PM UTC blk 672,670
TRANSFER Nov 8, 2022 · 02:29 PM UTC blk 637,796
REGISTER Mar 9, 2022 · 09:19 PM UTC blk 602,365
REGISTER Dec 2, 2013 · 02:11 PM UTC blk 148,957
Wert
meone to do just the opposite of its intended purpose...

        Note that this article is intended as a reference guide for use by
persons familiar with the basics of either LMOS/MLT or the operation of the
ARSB/CRAS (or hopefully both), because several references will be made to
information pertaining to the above systems/bureaus. I have no manuals on this
topic, all information has been obtained through practical experience and
social engineering.

                          ********************

--------------------------------
Serving Area Concepts (SAC) plan
--------------------------------

        In order to standardize the way loop distribution plants are set up in
the Bell System of the U.S. (and to prevent chaos), a reference standard design
was created.  For urban and suburban areas, this plan was called the Serving
Area Concepts (SAC) plan.  Basically, in the SAC plan, each city is divided
into one or more Wire Centers (WC) which are each handled by a local central
office